61.4 F
Duluth
spot_img

Duluth HART ramp partially closed for structural repairs

Date:

Share:

On May 2, 2025, at the monthly meeting of the Duluth Parking Commission, Parking Director Mark Bauer...

A subscription is required to access this article. Subscribe or click login below:

━ more like this

Superior landfill gas-to-data project terminated over a year ago

In November of 2023, the City of Superior entered into a contract with Vespene Energy, a California company interested in constructing a small data...

How the data center guided the new Hermantown Comprehensive Plan

The most important document underlying Google’s proposed data center in Adolph is the City of Hermantown’s 2045 Comprehensive Plan. The city would not have...

Broken Burke Apartments elevator makes life difficult for disabled tenants

Managed by Accessible Space Inc. out of St. Paul, the Burke Apartments serve tenants with mobility issues and other physical disabilities. On Aug. 13,...

Superior woman paints 90 rocks in memory of father

On Aug. 17, 2026, Superior resident Gemma Davies and her husband, Brad, spent the day traveling around the Twin Ports and along Lake Superior’s...

State shuts down Northland Driving School

On Aug. 13, 2026, the Minnesota Department of Public Safety Driver & Vehicle Services (DVS) taped a Cease and Desist Order to the door...
spot_img

1 COMMENT

  1. Looks like a Post Tension (stressed cables in place ) building? I have worked on them but not a fan. It will be interesting to see what type of repair this will entail. I have faith in the engineers and thankfully Bauer was paying attention.

LEAVE A REPLY

Please enter your comment!
Please enter your name here